Project numbers changing after project period.

You may note that observation, observers, and species total change after completing the City Nature Challenge.

The final tally for this, and all projects in the CNC is a snapshot at the respective cut-off time.

OBSERVATIONS:
Observations taken over the 4-day period and uploaded after the additional grace period do still reflect in the project. Thus, the project will collect all information until everyone has finished their uploads.
Please, do not go and delete those observations now, or stop your uploads. They may not have counted for the CNC but are still valuable information.
There is no “Added By” cut-off date in the project. Thus, the project still includes these late observations.

Also, observers may have deleted a duplicate observation or made some other form of correction that will also reflect on the project.

SPECIES:
Observations will still get verified over time.
Of the 13085 observations, 7113 achieved research grades so far. So, as time passes, and experts carry on identifying this number will change. This is almost 55% of the observations that got research grade.

OBSERVERS:
An observer may have incorrectly placed an observation within the project and later corrected this error. After the correction, the observers’ numbers will also change, and this would also affect the total observations for the period.

To get a more accurate reflection on what was uploaded from 28 April – 28 May 23 follow this link:
https://www.inaturalist.org/observations?created_d1=2023-04-28&created_d2=2023-05-08&d1=2023-04-28&d2=2023-05-01&place_id=any&project_id=city-nature-challenge-2023-garden-route&subview=map&verifiable=any
No one has control over any user amending or deleting their observations over time.

Publicado el 11 de mayo de 2023 a las 07:34 AM por shauns shauns

Comentarios

No hay comentarios aún.

Añade un comentario

Entra o Regístrate para añadir comentarios